Public Projects

Bidding Closed
12/4/25 2:00pm
MUSC Campus Connector Bridges: RFP to Provide Construction Management at Risk
Bidding Closed
MUSC
Charleston, SC
Construction of an elevated connector bridge adjacent to Doughty Street from the 2nd floor of the Ashley River Tower to the 2nd floor of the Bioengineering Building, including a connection from this new bridge to the Thurmond Gazes Building.
Bidding Closed
12/18/25 9:00am
Thurmond Gazes Building Air Handler Units 3 and 6 Replacement #H51-9862-JR
Bidding Closed
MUSC
Charleston, SC 29425
Replacement of existing air handling unit #6 at Thurmond Gazes with a new air handling unit, modified electrical to emergency power, structural modifications, and roofing replacement below and around the new unit as detailed on the drawings and in the specifications.
Bidding Closed
12/18/25 2:00pm
Sebring-Aimar House HVAC Renovation #25-083594
Bidding Closed
MUSC
268 Calhoun St., Charleston, SC 29425
Replacement of HVAC equipment along with associated controls, and electrical components.
Bids due in 20 days
1/15/26 5:00pm
MUSC Pee Dee Division Landscaping RFP
Bids due in 20 days
MUSC
Florence, Marion and Williamsburg Counties, SC
MUSC Health Pee Dee Division is seeking a 3 year proposal for landscaping services at its facilities in Florence, Marion, and Williamsburg Counties.
Bidding Closed
11/12/25 2:00pm
MUSC Campus Connector Bridges: RFQ to Provide Construction Management at Risk
Bidding Closed
MUSC
Charleston, SC
Construction of an elevated connector bridge adjacent to Doughty Street from the 2nd floor of the Ashley River Tower to the 2nd floor of the Bioengineering Building, including a connection from this new bridge to the Thurmond Gazes Building.
Bidding Closed
11/13/25 2:00pm
MUSC College of Health Professions Buildings A and B Renovations #H51-N376-ML
Bidding Closed
MUSC
Medical University of South Carolina, Charleston, SC
Approx. 29,100 SF interior renovation to create new and modify existing classrooms, conference rooms, teaching labs, and offices; work includes selected demolition, gypsum board walls, wood doors, metal frames, storefronts, acoustical ceilings, new finishes, and mechanical, electrical and plumbing; work performed in two phases.