MUSC Hollings Cancer Center Lab Air System Replacement
Project scope consist of removal and replacement of existing exhaust fans on the roof of Hollings Cancer Center. Fans serve general lab exhaust and hoods within Hollings Cancer Center.
Addendum 1
(click to expand/collapse)

Name | Size | ||
H51-N357-ML_HCC Lab Air System Replacement Addendum #1 | 668.1 KB |