MUSC HCC Generator #3 Replacement - H51-N356-ML
Electrical upgrades and replacement of electrical equipment associated with the emergency power system in Hollings Cancer Center. The existing 1000kW diesel-electric emergency generator #3, the existing 1600A switchboard ‘SBEH4A’, and automatic transfer switches ATS-5 and ATS-6 will be replaced with a new roof-mounted 2000kW diesel-electric emergency generator, a new 2500A emergency switchboard and new automatic transfer switches. The scope of work will also include fuel-oil piping modifications.
Plan Holders
Date | Company | Contact |
6/7/22 2:48 pm |
Construct Connect
30 Tech Pkwy South Suite 100 Norcross, GA 30092 |
Ardie Destor
Tel: 323-602-5079
|
6/16/22 7:50 am |
Construct South Inc
302 May St St George, SC 29477 |
Stokes Brownlee
Project Manager
Tel: 18435600847
|
6/4/22 6:49 am |
Dodge Construction Network
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
|
6/7/22 10:09 am |
Feyen Zylstra
8351 Palmetto Commerce Parkway Unit 106 Ladson, SC 29456 |
Bryan Perkins
SR. Field Operations Manager
Tel: 8439903582
|
6/3/22 9:53 am |
Gatch Electrical
941 Dupont Road Charleston, SC 29407 |
Kelley Canady
Tel: 8435730700
|
6/16/22 8:20 am |
Generator Services, Inc
31 C.Trotter Rd. West Columbia, SC 29169 |
Dillon Harper
Account Manager
Tel: 803-939-1470
Fax: 803-939-1473
|
6/15/22 7:57 am |
Metro Electric Co., Inc.
3350 Meeting Street Road North Charleston, SC 29405 |
Harry Ericson
Project Manager
Tel: 843-554-0621 Ext 213
Fax: 843-554-0625
|