MUSC HCC Generator #3 Replacement - H51-N356-ML

Electrical upgrades and replacement of electrical equipment associated with the emergency power system in Hollings Cancer Center. The existing 1000kW diesel-electric emergency generator #3, the existing 1600A switchboard ‘SBEH4A’, and automatic transfer switches ATS-5 and ATS-6 will be replaced with a new roof-mounted 2000kW diesel-electric emergency generator, a new 2500A emergency switchboard and new automatic transfer switches. The scope of work will also include fuel-oil piping modifications.
Date Company Contact
1654613288
6/7/22 2:48 pm
Construct Connect 30 Tech Pkwy South Suite 100
Norcross, GA 30092
Ardie Destor
Tel: 323-602-5079
1655365839
6/16/22 7:50 am
Construct South Inc 302 May St
St George, SC 29477
Stokes Brownlee
Project Manager
Tel: 18435600847
1654325341
6/4/22 6:49 am
Dodge Construction Network 2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Tel: 413-376-7032
1654596562
6/7/22 10:09 am
Feyen Zylstra 8351 Palmetto Commerce Parkway Unit 106
Ladson, SC 29456
Bryan Perkins
SR. Field Operations Manager
Tel: 8439903582
1654250023
6/3/22 9:53 am
Gatch Electrical 941 Dupont Road
Charleston, SC 29407
Kelley Canady
Tel: 8435730700
1655367649
6/16/22 8:20 am
Generator Services, Inc 31 C.Trotter Rd.
West Columbia, SC 29169
Dillon Harper
Account Manager
Tel: 803-939-1470
Fax: 803-939-1473
1655279828
6/15/22 7:57 am
Metro Electric Co., Inc. 3350 Meeting Street Road
North Charleston, SC 29405
Harry Ericson
Project Manager
Tel: 843-554-0621 Ext 213
Fax: 843-554-0625