MUSC BSB AHU-3 and AHU-5 Replacement

Replace (2) air handling units, one in the BSB penthouse and one on the BSB roof with (1) rooftop air handling unit. Scope includes duct connections, electrical, automatic temperature controls and other work indicated in the contract documents.
  Drawings (click to expand/collapse)
Name Size
H51-9845 - Drawings - Bid 10.3 MB