MUSC BSB AHU-3 and AHU-5 Replacement

Replace (2) air handling units, one in the BSB penthouse and one on the BSB roof with (1) rooftop air handling unit. Scope includes duct connections, electrical, automatic temperature controls and other work indicated in the contract documents.
  Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
BSB AHU4 & AHU5 Addendum 1 Complete 463.9 KB
  Addendum 2 (click to expand/collapse)