MUSC Story Eye Institute AHU Replacement

Work includes removal of existing air handling units, disconnect ductwork and chilled water piping and installation of a replacement-in-kind air handling unit of Floors 1, 2, 3, 4 and 5. Work shall also include replacement and upgrade of HVAC controls.
  Addendum 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
H51-50084_17120-03_191120 MUSC Storm Eye Institute AHU Replacement _ Addendum #1 537.6 KB
  Addendum 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
H51-50084_17120-03_191114 MUSC Storm Eye Institute AHU Replacement _ Addendum #2 429.4 KB